Key Points

  • The Eighth Circuit denied the Iowa Environmental Council and Sierra Club's emergency motion to stay EPA's emergency permit authorizing the Army to detonate 68 drums of deteriorated lead azide in place at the Iowa Army Ammunition Plant, and lifted its administrative stay.
  • The panel held the petitioners had not shown a likelihood of success on their claims that the permit lacked adequate protective conditions and that EPA failed to adequately consider alternative treatment methods, citing the permit's conditions and EPA's reliance on Army explosives experts.
  • Reading 40 C.F.R. § 270.61 as a whole, the court concluded the 45-day notice and comment period is not a prerequisite to an emergency permit where it would be inconsistent with the emergency situation.
  • On the remaining stay factors, the court weighed a controlled detonation with safety measures against the risk of an uncontrolled explosion and found the balance favored the controlled detonation.
  • The court declined to address the Army's stated intent to proceed under RCRA's emergency exclusion without the permit, because the Army is not a defendant and that plan is not before the court.

A federal appeals court on Nov. 23 refused to block an emergency permit that lets the Army detonate 68 drums of deteriorated lead azide at an Iowa ammunition plant. The court concluded that the groups had not shown they were likely to win, and it reasoned that the choice before it was not between a detonation and no explosion at all, but between a controlled blast with safety measures and an uncontrolled one without them.

A three-judge panel of the U.S. Court of Appeals for the Eighth Circuit, Circuit Judges Shepherd, Grasz and Justin D. Smith, denied an emergency motion by the Iowa Environmental Council and the Sierra Club to stay the Environmental Protection Agency's permit while their petition for review is pending. In an unsigned, published opinion, the panel held that the groups had failed to show they were likely to prevail. It also lifted the administrative stay, a temporary pause the court had entered Nov. 20.

The ruling removes the court-ordered pause on a permit authorizing the Army to detonate the explosive in place at the Iowa Army Ammunition Plant in Middletown. The panel also read EPA's hazardous waste rules to hold that "the 45-day notice and comment period is not a prerequisite to issuing an emergency permit" when such a period would be inconsistent with the emergency.

Lead azide, the opinion says, is "an explosive compound used as a detonating agent for other explosives." The Army determined in March 2026 that the lead azide in the drums, stored for more than two decades in earth-covered magazines, had deteriorated. Changes to the drums' storage solution let the lead azide recrystallize, "rendering the explosive material unstable due to its increased sensitivity to shock and friction."

On Nov. 13, EPA approved an emergency permit that "for the first time, authorized the intentional detonation of the lead azide in place in the earth-covered magazines." The Army scheduled two controlled detonations for Nov. 20. Its public advisory warned of a plume of lead-containing particles and stated that "Lead is toxic to humans and animals." Citing the potential for localized window damage, the advisory also recommended that residents of the Middletown City Park neighborhood temporarily leave during the detonations.

EPA published notice of the permit on Nov. 16. The groups filed their petition and stay motion on Nov. 19, the same day the Army postponed the detonations to Nov. 23. They argued that the permit allows the Army "to detonate hazardous lead azide in the open, thus creating a plume of lead dust that will blanket homes and communities, possibly as far away as 100 miles or more."

The groups contended that the permit was arbitrary and capricious, the Administrative Procedure Act standard under which courts set aside irrational agency action. They said it lacked adequate protections for public notification, monitoring, cleanup and vulnerable populations, and that EPA accepted the Army's rejection of alternatives such as chemical neutralization without enough scrutiny.

The panel disagreed, pointing to permit conditions requiring containment barriers, weather restrictions, advance public notification, updated air dispersion modeling, environmental monitoring, and sampling of soil and high-contact surfaces, along with a requirement that the Army begin specified sampling within 24 hours of detonation. The court wrote that "these conditions demonstrate that the EPA considered the potential environmental consequences and imposed measures to address them."

The court also noted that EPA relied on Army explosives experts who concluded that disturbing the material would create an unacceptable risk of an uncontrolled explosion. It held that "the record does not provide a sufficient basis to conclude that the EPA failed to meaningfully consider safer alternatives or that its reliance on the Army's technical assessment was unreasonable."

The procedural challenge turned on a regulation, 40 C.F.R. § 270.61(b)(5), that requires emergency permits to be accompanied by public notice under a separate rule calling for "at least 45 days for public comment." The court acknowledged that cross-reference. But reading the regulation as a whole, it relied on a neighboring subsection requiring emergency permits to incorporate substantive standards "to the extent possible and not inconsistent with the emergency situation." The panel concluded that the "lack of any such notice and comment period for the Permit is not fatal to its issuance."

On irreparable harm, the court acknowledged, and said the parties agreed, that the detonation "will result in harm to the public through environmental and health risks." But the panel wrote that "here we are faced with a situation in which the risk is between a controlled detonation and an unplanned explosion, not between the risk of a controlled detonation and no explosion at all."

The court cited record evidence that the lead azide cannot be moved and that freezing temperatures raise the risk of a chain reaction of uncontrolled explosions. A controlled detonation, by contrast, lets the Army choose favorable weather, notify the public in advance and begin its environmental response immediately. "In this context, a controlled detonation with attendant safety measures better alleviates the risk of irreparable harm than the risk of an uncontrolled explosion," the panel wrote. The remaining factors, it said, pointed the same way.

"We are mindful of the very real risks presented by the Army's planned detonation of the stores of degraded lead azide," the court wrote. But it said the degraded explosives "present a risk of an uncontrolled and unplanned explosion, which would occur without the benefit of the safety measures that the Permit puts in place."

The opinion also recounts a Nov. 21 EPA filing stating that the Army intended to invoke an emergency exclusion under the Resource Conservation and Recovery Act, the federal hazardous waste law at issue, to carry out a controlled detonation without the permit. The filing cited falling temperatures and stated that "the Army intends to Act on November 24, 2026." Because the Army is not a defendant and the stay motion challenged only EPA's permitting decision, the panel declined in a footnote to opine on that plan.

The court granted the groups' motions to file an overlength stay motion and additional declarations. Their petition for review remains pending before the Eighth Circuit, and the permit expires Feb. 11, 2027.